Mumbai’s Kalyan Division Embarks on Ambitious Infrastructure Overhaul

In a monumental step forward, the Kalyan of Mumbai has initiated a transformative project as part of the Mumbai Urban Transport Project (MUTP) 3A. The project, with an estimated cost of ₹812.97 crores, focuses on the segregation of long-distance and suburban traffic while unifying the Goods Yard.

Key Project Components:

  • Passenger Platforms: Construction of six new platforms, each stretching an impressive 620 meters in length.
  • Deck Slab: Extensive coverage of deck slabs across the entire platform area for enhanced functionality.
  • Goods Yard Operations: Implementation of reception and dispatch lines for efficient goods operations, catering to Kasara and Karjat directions. The simultaneous facility is available on both sides.
  • Shunting Neck: Full-length shunting necks established at Igatpuri and CSMT ends for improved operational capabilities.
  • Mechanical Examination Facilities: Installation of examination facilities on two lines to ensure mechanical efficiency.
  • Goods Shed Enhancement: Strategic improvement of the Goods shed, including modifications to enhance overall connectivity.
  • Circulating Area: Development of a well-designed circulating area to seamlessly connect passengers and the Goods Yard.
  • Road Over Bridge (ROB): Construction of a parallel ROB to Patri Pull ROB, with a landing towards the proposed station building and circulating area.
  • Foot Over Bridges (FOB): Provision of three new FOBs connecting existing platforms to proposed platforms and beyond, alongside service buildings.

Work in Progress:

  • Relocation: Finalization of the relocation process for affected service buildings and quarters.
  • Tender Awards: Successful tender awards for earthwork and minor bridges.
  • Dismantling Process: Ongoing dismantling process of 15 old goods lines, with 70% completion.
  • Track Work: Processing of tenders for track work to ensure a robust rail infrastructure.
  • Infrastructure Development: Progress in drains, boundary wall construction, and overall earthwork.

Project Objective: The comprehensive project aims at the efficient segregation of long-distance and suburban local trains, envisioning a significant improvement in overall mobility within the region. The ongoing developments underscore the commitment to advancing Mumbai’s rail infrastructure for the benefit of its residents.

Siddharatha

A proficient tv reporter with excellent researching skills. I'm adept at telling stories filled with scientific fervour. Stories which are useful for our viewers and enabling them to get real insight for their life. Experienced in tv reporting with more than 17 years of rich experience with leading news channel AajTak. A varied experience of telling news stories, editing articles, covering events and interviewing celebrities across myriad beats like environment, science, climate, weather, disaster, railways, agriculture, socially-relevant topics and human interest stories. Both as a team-player and as an individual my goal has always been, and shall remain, to adhere to deadlines without compromising on quality with the sole aim to grow as an individual by following journalistic ethics and humanity.

Related Articles

Back to top button