Major Infrastructure Boost as Wardha-Nanded New Line Progresses in Nagpur Division

In a significant development for the Nagpur division, the construction of the Wardha-Nanded New Line via Yavatmal-Pusad is making substantial strides. With a total estimated cost of ₹3445.48 crore, the project has seen an expenditure of ₹1910.07 crore to date.

The overall physical progress stands at an impressive 47%, covering a length of 270 km. The land acquisition phase has been notably efficient, with 89% completion, encompassing 1911 out of 2138 hectares.

As construction advances, key milestones include:

  • Earthwork: 87.54/201.14 Lcum (44%)
  • Formation: 40/284.60 km
  • Major Bridges: 32/80
  • Minor Bridges: 50/320
  • Road over Bridge (ROB): 43 in Progress
  • Rail Under Bridge (RUB) / Limited Height Subway (LHS): 19/52 in Progress
  • Station Building: 3/27
  • Tunnels: 6 in progress out of a total 8 km length
  • Track Linking: 28/284.60 track km

The completion of this new line is poised to enhance connectivity between the Vidarbha and Marathwada regions, fostering economic and social development.

Providing a broader context, Central Railway’s divisions have made commendable progress in the current fiscal year, with a cumulative completion of 161.80 km of multitracking (new line/doubling/3rd/4th line) since April 2023. The railway division had allocated ₹3890 crore for new lines, doubling, and third/fourth lines this year, with an expenditure of ₹2990 crore executed thus far. This ambitious endeavor is set to fortify railway infrastructure and connectivity across Central Railway’s five divisions.

Siddharatha

A proficient tv reporter with excellent researching skills. I'm adept at telling stories filled with scientific fervour. Stories which are useful for our viewers and enabling them to get real insight for their life. Experienced in tv reporting with more than 17 years of rich experience with leading news channel AajTak. A varied experience of telling news stories, editing articles, covering events and interviewing celebrities across myriad beats like environment, science, climate, weather, disaster, railways, agriculture, socially-relevant topics and human interest stories. Both as a team-player and as an individual my goal has always been, and shall remain, to adhere to deadlines without compromising on quality with the sole aim to grow as an individual by following journalistic ethics and humanity.

Related Articles

Back to top button